| No. | Optional Pretreatment Methods | Remarks |
| 1 | Buffer Tank | |
| 2 | Buffer Filter Tank | For water removal additionally |
| 3 | Water Seal Tank | |
| 4 | Dual Water Seal Tanks |
| No. | Optional Treatment Equipment | Remarks |
| 1 | Waste Heat Boiler | Steam recovery |
| 2 | Heat Exchanger | Recover hot water, hot air, heat-conducting oil, etc. |
| 3 | Quench Tower | Flue gas cooling |
| 4 | Dry Reactor | Remove moisture, acidic substances and dioxins from flue gas |
| 5 | Baghouse Dust Collector | Dust removal from flue gas |
| 6 | Scrubber Tower | Remove acidic substances from flue gas |
| 7 | Wet Electrostatic Precipitator | Remove fine dust and water vapor from flue gas |
| No. | Item | Description |
| 1 | Client | Sinopec East China Oil & Gas Field Branch |
| 2 | Waste Gas Source | Production unit |
| 3 | Waste Gas Flow Rate | 600 Nm³/h |
| 4 | Main Waste Gas Components | CH₄, C₂H₆, C₃H₈, i-C₄H₁₀, n-C₄H₁₀, i-C₅H₁₂, n-C₅H₁₂, C₆H₁₄, C₇H₁₆, C₈H₁₈ |
| 5 | Waste Gas Concentration | 34.5% |
| 6 | Process | TO Furnace + Cooler + Heat Exchanger + Chimney |